The last couple of weeks have been spent getting a sump pump installed and working to keep the area dry so the trucks could get in to drill the piers. Today thirty-six 28'-deep piers were drilled and filled with concrete—the beginning of a solid foundation!
 |
Arm of Concrete Pumper Truck |
 |
2 Drilling Trucks |
 |
Drill Operator |
|
|
|
 |
Guiding the arm into the hole to fill with concrete (the guy in the orange hat is using a remote control) | |
|
|
|
|
 |
Close-up of hole with concrete and re-bar installed. |
 |
Steve fits right in with his NREL safety garb, and is loving being able to be so up close and involved! |
No comments: