The windows are installed, and a framer is working on installing the basement door. The clerestory still needs to be built at the peak of the roof.
This is the front door, which will be eventually be under a porch. It will be at the front of the airlock entry.
This is the back of the house, still waiting for the clerestory to be built. The roof will go from the top of the clerestory down to the top of this wall. This is where you can see how much earth sheltering there is. The back wall of the house is about 4 feet out of the ground. The garage is the part that has the plywood installed on the roof.