Here is a summary of what's been happening the past few weeks:

A workshop has been set up in the garage.

Shelves are being installed in closets and other spaces.  This the the future custom pantry.

The cabinets have been delivered and installation should begin next week.

The doors have been delivered and installation has begun.  These are doors to master bedroom and master bath (taken from inside the master suite).

The concrete floor has been poured, and we are trying to decide on a stain color.

 Tile installation has begun.  This is the wall in Steve's office, with tile being installed to cover the concrete foundation wall.

This is the hall bath.

This is the master bath, first the shower and linen closet, then the tub.